I'm building the Khanspires for use as mains in a system with the WTMW Center and NataliePs as surrounds. I've already finished the NatPs and am building the WTMW Center at the same time.
Boards ready for building:

Gluing on the top and bottom panels:

Gluing on the top and bottom for the second cabinet as well as for the mid chamber:

Gluing together the braces:

Attaching the rear braces to the mid enclosures:

Gluing the braces onto the cabinet side panels:


Attaching the opposing side panel:

Gluing together the baffle pieces:

Current state of the enclosures:

They look a little crooked in the photo but I think that is just an optical effect. The measure square.
Up next will be attaching the rear panel and working on the cross overs. A couple of inductors are on back order at PE until July so it will be a bit of a wait.
Boards ready for building:
Gluing on the top and bottom panels:
Gluing on the top and bottom for the second cabinet as well as for the mid chamber:
Gluing together the braces:
Attaching the rear braces to the mid enclosures:
Gluing the braces onto the cabinet side panels:
Attaching the opposing side panel:
Gluing together the baffle pieces:
Current state of the enclosures:
They look a little crooked in the photo but I think that is just an optical effect. The measure square.
Up next will be attaching the rear panel and working on the cross overs. A couple of inductors are on back order at PE until July so it will be a bit of a wait.

ops:
Comment